A bi-objective genetic algorithm approach to risk mitigation in project scheduling
dc.contributor.author | Kılıç, Murat | |
dc.contributor.author | Ulusoy, Gündüz | |
dc.contributor.author | Şerifoğlu, Funda Sivrikaya | |
dc.date.accessioned | 2021-06-23T19:25:54Z | |
dc.date.available | 2021-06-23T19:25:54Z | |
dc.date.issued | 2008 | |
dc.department | BAİBÜ, İktisadi ve İdari Bilimler Fakültesi, İşletme Bölümü | en_US |
dc.description | 11th International Conference on Industrial Engineering and Systems Management -- MAY 16-19, 2005 -- Marrakech, MOROCCO | en_US |
dc.description.abstract | A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization problem, where the expected makespan and the expected total cost are both to be minimized. The expected total cost is the sum of four cost components: overhead cost, activity execution cost, cost of reducing risks and penalty cost for tardiness. Risks for activities are predefined. For each risk at an activity, various levels are defined, which correspond to the results of different preventive measures. An MIP model and a heuristic solution approach based on genetic algorithms (GAs) is proposed. GAs provide a fast and effective solution approach to the problem. (c) 2007 Elsevier B.V. All rights reserved. | en_US |
dc.identifier.doi | 10.1016/j.ijpe.2006.08.027 | |
dc.identifier.endpage | 216 | en_US |
dc.identifier.issn | 0925-5273 | |
dc.identifier.issn | 1873-7579 | |
dc.identifier.issue | 1 | en_US |
dc.identifier.scopus | 2-s2.0-38749119736 | en_US |
dc.identifier.scopusquality | Q1 | en_US |
dc.identifier.startpage | 202 | en_US |
dc.identifier.uri | https://doi.org/10.1016/j.ijpe.2006.08.027 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12491/6312 | |
dc.identifier.volume | 112 | en_US |
dc.identifier.wos | WOS:000253605200018 | en_US |
dc.identifier.wosquality | Q1 | en_US |
dc.indekslendigikaynak | Web of Science | en_US |
dc.indekslendigikaynak | Scopus | en_US |
dc.institutionauthor | Şerifoğlu, Funda Sivrikaya | |
dc.language.iso | en | en_US |
dc.publisher | Elsevier B.V. | en_US |
dc.relation.ispartof | International Journal Of Production Economics | en_US |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Project Scheduling | en_US |
dc.subject | Risk | en_US |
dc.subject | Multiobjective Optimization | en_US |
dc.subject | Genetic Algorithms | en_US |
dc.title | A bi-objective genetic algorithm approach to risk mitigation in project scheduling | en_US |
dc.type | Conference Object | en_US |
Dosyalar
Orijinal paket
1 - 1 / 1
Küçük Resim Yok
- İsim:
- murat-kilic.pdf
- Boyut:
- 419.38 KB
- Biçim:
- Adobe Portable Document Format
- Açıklama:
- Tam metin/Full Text