Kavlak, NurselUlusoy, GündüzBirbil, İlkerŞerifoğlu, , Funda Sivrikaya2021-06-232021-06-23200597556126539789755612652https://hdl.handle.net/20.500.12491/4408https://www.scopus.com/inward/record.uri?eid=2-s2.0-84886876904&partnerID=40&md5=41f7c54d836ac75ea4db43ca92a9d56235th International Conference on Computers and Industrial Engineering, ICC and IE 2005 -- 19 June 2005 through 22 June 2005 -- Istanbul -- 100139This study focuses on the client-contractor bargaining problem in the context of multi mode resource constrained project scheduling. The bargaining objective is to maximize the bargaining function comprised of the individual NPV maximizing objectives of both the client and the contractor. Tabu Search and Simulated Annealing are proposed as solution procedures.eninfo:eu-repo/semantics/closedAccessBargainingMulti objective decision makingResource constrained project schedulingClient-contractor bargaining on net present value in the context of a project with limited resourcesConference Object110911142-s2.0-84886876904N/A